Digital MRV · Signature capabilityFrom field evidence to verification-ready climate outcomes.
Where we apply it
Nature-based solutions and carbon removals.
Digital MRV is built for projects where outcomes depend on land, soil and living systems, and on a reliable chain of custody.
- 01Agriculture and regenerative practices
- 02Agroforestry and forestry
- 03Soil carbon
- 04Rice methane
- 05Land restoration and landscape projects
- 06Biodiversity and natural capital monitoring
The digital MRV workflow
How one project claim becomes a verified outcome.
Eight stages, from project setup to registry. Scroll through each stage; every one carries a clear statement and an example of the evidence it produces.
Illustrative
Illustrative
- STAGE 01 / 08
Project setup
Define the project, its boundary, the methodology and the monitoring plan before any data is collected.
Illustrative evidence: Project boundary file and land records
- STAGE 02 / 08
Baseline
Establish what would have happened without the project, using the baseline approach the methodology requires.
Illustrative evidence: Baseline land-use classification
- STAGE 03 / 08
Satellite + field monitoring
Combine remote-sensing imagery with geo-tagged field records, measurements and sampling.
Illustrative evidence: Geo-tagged sampling record with timestamp and location
- STAGE 04 / 08
Calculation
Apply the selected methodology to monitored data, with version-controlled assumptions and factors.
Illustrative evidence: Calculation workbook with factor and equation references
- STAGE 05 / 08
Evidence
Link every figure to its sources, chain-of-custody records and methodology clauses.
Illustrative evidence: Methodology-clause mapping for each data requirement
- STAGE 06 / 08
Reporting
Assemble monitoring reports from governed results rather than manual copy-and-paste.
Illustrative evidence: Monitoring report draft generated from approved results
- STAGE 07 / 08
Verification
Give the independent verifier a complete, navigable evidence pack. Verification itself is performed by an independent body.
Illustrative evidence: Monitoring and verification pack
- STAGE 08 / 08
Registry
Support registry submission and issuance, then track credits through to retirement.
Illustrative evidence: Issuance request and credit-tracking record
Evidence types
The evidence behind every result.


- E01Satellite and remote-sensing imagery
- E02Geo-tagged field records
- E03Land and project records
- E04Measurements and sampling
- E05Chain-of-custody records
- E06Methodology-clause mapping
- E07Review and approval history
- E08Monitoring and verification packs
Traceability viewer · Illustrative example
Follow one claim through its evidence chain.
Claim → Source → Methodology → Calculation → Evidence → Validation → Approval. Use the tabs, or the arrow keys, to move through each step.
Step 1 · Claim
What is being claimed
Change in soil organic carbon across the monitored plots for the monitoring period.
- Claim type
- Removal (soil carbon)
- Boundary
- Monitored plots within the project boundary
Illustrative record
Responsible technology
AI assists. Governed methodologies calculate. Experts review. Evidence supports the outcome.
Next step
Discuss a Digital MRV project.
Tell us about your project type, location and stage. We will help you understand methodology fit, monitoring needs and the evidence you will need.







