Climate claims that survive the audit.
VericarbonMRV runs digital MRV for nature based solutions and carbon removals, builds ISO and GHG Protocol aligned carbon accounts, and provides independent validation & verification one chain of proof from field to registry.
NBS MRV
Removals
Accounting
- The problem we solve
Most carbon projects don’t fail in the field. They fail at verification.
Missing land records, unverifiable baselines, gaps between what was claimed and what can be evidenced these are what stall issuance and erode buyer trust. We build the evidence chain from day one, so verification is a formality, not a fight.
3-layer
Evidence model satellite, field, records
100%
Plots land-record verified before enrolment
Audit-ready
Evidence packs mapped to methodology clauses
Zero
Tolerance for double-counting & ghost plots
- What we do
MRV, accounting and verification under one roof
Precise measurement and reporting for nature-based carbon projects ensuring audit-ready data.
- SVC · NbS MRV
Nature-based solutions MRV
Digital MRV for agriculture, agroforestry, soil carbon and rice methane projects, satellite monitoring, geo tagged field evidence and land-record verification in one evidence chain.
- SVC · Removals
Carbon removals MRV
Chain of custody MRV for durable removals biochar, enhanced weathering and other CDR pathways tracked from feedstock to storage with durability evidence auditors accept.
- SVC · Accounting
Carbon accounting
GHG inventories and project quantification aligned to the GHG Protocol and ISO 14064 Scope 1-3 footprints, baselines and reduction claims with a transparent calculation trail.
- SVC · Accounting
Validation & verification
Independent third party validation of project design and verification of monitored outcomes plus audit-readiness support for projects facing an external VVB.
- The method
Measure. Report. Verify.
MRV is a sequence, and we treat it like one each stage produces evidence the next stage depends on.
- M / 01
Measure
Enrol plots with verified land records, baseline them with satellite history, and capture geo-tagged field data through the season.
- R / 02
Report
Compile monitoring reports that map every claim to its evidence — plot by plot, clause by clause of the methodology.
- V / 03
Verify
Hand auditors a clean, cross-referenced evidence chain and support the VVB through sampling, site visits and issuance.
- Next step
Bring us in before the auditors arrive.
Whether you’re designing a new project or rescuing a stalled one, the earlier the evidence chain starts, the cheaper and faster verification gets.